Problem: GLC faced a disaster. A footbridge over the Blackwall Tunnel approach road was dropped; they needed expert technical advice immediately. The advice provided by Lifting & Access was also to be used for a legal case. Lifting & Access were instructed to provide a solution within a week.
Solution: Lifting & Access reacted quickly by designing, manufacturing and installing a set of spreader beams and wire strops to move the footbridge. We resolved the break-down scenario in a week. It suited all health and safety and L.O.L.E.R requirements.
Link: www.london.gov.uk
< Back to Case Studies |